FIVE PILOTS · ALL SIMULATED
Make help
reach people.
Try five systems that have to do more than send a notification. See what each would recommend, what it would hold, and what counts as proof that it helped.
Demo only. Every case is fictional. Nothing is submitted, dispatched, paid, or changed.
REAL-WORLD TESTS
What we’d need to prove.
A demo result is not evidence that anyone was helped. Each pilot starts with one accountable operator and ordinary service still available if the system fails.
01 · Prevent loss of coverage or housing
- First test
- One Ohio Medicaid navigator uses an existing queue of verified, action-needed renewals. An operator owns each unresolved blocker. A second, separate lane would work with tenant-side legal aid, not a shared case database.
- Measure
- Agency-verified continued coverage, missed work, and staff time, including cases the team could not reach. Compare to ordinary service without withholding urgent help.
- Stop
- An unverified date does not become a deadline. Stop for unauthorized disclosure, a pilot-caused missed critical event, or urgent work without a staffed fallback.
02 · Confirm disaster aid reached someone
- First test
- Run a tabletop with one authorized emergency operations team and its existing shelter network. Ask staff to verify accessibility and fresh capacity, then reconcile what happened after a handoff.
- Measure
- Verified safe receipt, unserved requests, and time to receipt. An assignment never counts as delivery.
- Stop
- Stale or contradictory capacity goes to a human. No real dispatch, routing, or reservations through the demo. An offline handback is mandatory.
03 · Gate consequential AI actions
- First test
- Put one synthetic purchase in a vendor sandbox behind a provider-controlled authorization gate. Check that the exact action matches a fresh human approval.
- Measure
- Unauthorized effects, legitimate completion, reviewer delays, and receipts matched to the provider record. A generated receipt does not by itself prove an action occurred.
- Stop
- Do not repeat an unresolved request after a timeout. Keep it held until reconciliation. No real access, payment, or account changes.
04 · Get workers to their next paycheck
- First test
- One existing Ohio workforce team confirms that workers who want help reached a navigator. Offer a verified interview only when it meets the worker’s stated requirements and they explicitly opt in.
- Measure
- Days to the next paycheck, wage and hours recovery, and 90-day retention. Keep track of unavailable roles and unsuccessful handoffs.
- Stop
- Do not share a résumé without permission, suggest stale or fee-charging offers, or make a benefits decision.
05 · Verify what public funding actually delivered
- First test
- Use senior utility assistance as the starting point. An authorized reviewer checks payment posted, household served, and continuity at 30 and 90 days as three separate facts.
- Measure
- Verified continuity, missing follow-up, inequitable drop-off, and corrected issues. A utility payment is not proof that a shutoff was prevented.
- Stop
- Do not withhold aid because evidence is late or incomplete. Retain competing accounts and route them for review.